At long last the renovation to glass in the verandah has begun. I found a skilled carpenter willing to work with me who could find a source of locally harvested black locust timbers. This wood is highly rot and termite resistant.
|
Insulative strips for the slab. |
|
Insulative strip, foam insulation, and flashing. |
|
Before... |
|
During... |
The first step was to dress the slab for enclosure. As this space will be expected to provide lots of solar gain in the winter to heat the house and help propagate plants, the slab needed to be insulated, where possible, to break the thermal bridge which would rob the space of heat. I fashioned strips of blue foam insulation, scavenged of course, with 3/8 inch exterior plywood glued on to provide a rigid and protective surface. We painted them up, see the previous post of Jacqui painting the last ones in the midday sun. These were then screwed onto the slab using tapcon screws. Over this we laid a thin strip of foam insulation, found in my father's garage, and then metal flashing with a drip edge. On top of all this we placed the 6x6 posts and a 2x6 sole board to form the base for the windows.
Of course we first removed the old posts which happened to be filled with wasp nests. I was stung the day I removed the step railings, and being somewhat allergic, I swelled up, flushed and went all woozy for the rest of the day. So unfortunately the wasps had to go. We had been co-existing rather peaceably with them since we moved in, but they wouldn't tolerate this level of disturbance, and I couldn't tolerate multiple stings. We sprayed them with dish liquid and smashed the ones that persisted in returning. OM MANI PADME HUM for the wasps. May they be reborn quickly!
|
Framed for windows. |
|
Pretty, but not ready for sealing... |
After the posts and sole boards were in, we measured the windows and framed in the openings for them. They won 't be installed until the wood has a chance to dry thoroughly and gets a coat of finish/ preservative.
We haven't finished the framing because some of the wood we had drop shipped to us was unacceptable, and we are waiting for replacements.
|
No more steps! We'll have to walk around now. |
We also took this opportunity to get started on the deck that will go over the rainwater tanks. As the tanks will be in the way for the initial ledger attachment, we decided to get it done now. Tomorrow we hope the grading will take place for the tanks. This necessitated removing the east steps.
And oh yes, it was hot and humid, and we sweated buckets. The heat index was 99 degrees today, going up to 109 degrees tomorrow... a rest day! Welcome to the south in the summer.
No comments:
Post a Comment